Projects by region: Asia

GPM Gold Project

Client
Xstrata Technology
Location
Ararat, Armenia
Products
Gold
Project Capital Value
Unknown (Part of XT’s Overall Scope of Work)
Project Summary
The GPM Gold Operation is owned by GeoProMining LLC and consists of the Zod open cut mine near the Azerbaijan border and a processing plant at Ararat near the Turkish border. The gold bearing ore, mined at the GPM mine, is transported to the Ararat Process Plant via a state owned rail link.


Xstrata Technology was awarded the contract for the supply of an Albion Process™ to improve gold recovery and the refurbishment of existing facilities to treat 1,000,000 tonnes of ore per annum from a current throughput of 500,000 tonnes. EPMS was awarded the refurbishment engineering contract for the flotation plant, tailings and reagents areas.
Scope
Multi-disciplined Detailed Engineering

Design for the Refurbishment/Upgrade Works
Project Achievements
Client initiated scope changes impacted on both cost and schedule; however, through detailed planning and tight project control, EPMS was able to minimise schedule overruns.